Jobs still outstanding as of September 2005:

Source and fit vacuum exhausters (from an as yet unidentified scrap class 47). This will allow the associated pipework to be completed. The exhausters are housed in the 'A' end of the loco whilst all other brake equipment is in the 'B' end.

Install power unit in the 'A' end.

Source and fit air tanks (Ex-Class 31) in the 'B' end nose roof and carry out strengthening work to the 'B' end sideframes so they can hold the extra weight.

Brake frame components to be refurbished or replaced as necessary and braking system pipework to the cab to be completing.